Maintenance
Due
Being
able to quickly and easily determine which preventive maintenance is due and
overdue is one of the most important issues in tracking and controlling
preventive maintenance. A complete schedule of preventive maintenance, for any
time period, can be pulled using ASSETCONTROLLER Maintenance equipment
maintenance software. A user can easily view Maintenance Due schedules By
Equipment or By Date.
"By
Equipment" displays the following screen: 'Maintenance Due Sorted By
Equipment'.
Maintenance
Due Sorted By Equipment lists the equipment to be maintained, and the preventive
maintenance due for each equipment unit. For any Equipment Name selected, you
will see a list of all its pending preventive maintenance. Projected maintenance
due and open Work Orders are viewed here.
Locate
functions assist in quickly finding equipment from the list on the table in the
middle of the screen.
Type
to Locate Select the equipment detail you wish to enter for sorting purposes,
then type in that detail, and click Locate. The particular equipment piece
you've chosen will be highlighted in the lower screen.
Scan
a Barcode to Locate Select the Barcode scan format, then scan the equipment
Barcode, and click Locate. The particular equipment piece you've scanned will be
highlighted in the lower screen.
New
Unscheduled Work Order Emergency, unplanned preventive maintenance requires
clicking on New Unscheduled Work Order. Use the drop down menus (pre-entered
SETUP data) to select a piece of equipment, fill in its details, and the
required preventive maintenance to be covered in the New Unscheduled Work Order.
Create/Edit
Work Order
Create
or edit a Work Order for a preventive maintenance event by first selecting the
event from the lower left grid, then clicking the Create/Edit Work Order button.
A preventive maintenance Work Order is then created and a Work Order Number is
assigned automatically.
Assign
Work Order is designed to allow you to assign work orders to a specific user (or
employee) of ASSETCONTROLLER Maintenance, or at your facility.
Calendar
creates a visual agenda of preventive maintenance events, which are past due,
due today, this week, this month, etc., by selecting the specific date range you
wish to view.
Next
Due Date column, on the far left, is important as it lists the oldest,
uncompleted preventive maintenance events or opened, but not completed Work
Orders. If the manager determines a preventive maintenance event should have a
Work Order produced, he/she will simply select the event and click Create/Edit
Work Order.
Notes
& Exceptions fields allow the supervisor to enter notes as to what was done,
or if there were any variances. Both fields accept a great deal of typed
information for precise note sharing.
Performed
By establishes accountability for the equipment's preventive maintenance
history.
Approved
By Only a supervisor with the proper password may sign off or close a Work
Order.
Labor
Hours, Materials Cost & Equipment Down Time are entered by the supervisor
closing out the Work Order.
Operations
& Materials are automatically entered based on set up of the Maintenance
Profile.
FAQ's
1.
How do we track what work was actually done and when?
Completed
preventive maintenance and service activity can either be electronically
"signed off" as completed within ASSETCONTROLLER Maintenance
preventive maintenance software by the person performing the work, or a work
order with a signature line can be printed, which can be signed by the person
performing the work, and then filed as a hard copy. Such work orders contain a
list of all procedures to be performed and the materials to be used, so once
signed a verified record exists that not only the preventive maintenance or
service was performed, but the exact procedures followed and the parts and
materials used, and all costs.
2.
What happens if we miss a scheduled maintenance or service?
ASSETCONTROLLER
Maintenance fleet maintenance software allows a supervisor to note the reason,
and to reschedule the work (this must be done by a supervisor so work cannot be
missed or rescheduled without management control). When the work is rescheduled
and completed, ASSETCONTROLLER Maintenance fleet maintenance software
automatically adjusts the calendar by rescheduling the balance of the
maintenance . In other words, if a weekly preventive maintenance day is missed
by four days, and the work is then done, ASSETCONTROLLER Maintenance fleet
maintenance software reschedules the rest of the maintenance weekly from the day
the work was actually done.
3.
Can
we enter both detailed instructions on how the scheduled maintenance or service
is to be performed and the parts and materials required?
Yes, and a work order can be printed listing all procedure and
parts/materials.
|